Posts

Showing posts from December 9, 2012

engineering project ideas-continued

In cities, everywhere apartments, so why not an apartment management system or flats management system? Most apartment people were in double-earning status, so there might be less time for interaction between them. There will be no details who is going where, which should be attended if anything found wrong, when to schedule meetings, sharing news (especially for ladies). Even setting up a payment portal through which all apartment related expenses can be transferred. Another option, this can be developed as a mobile application also.

Engineering project ideas-continued

Take a floor plan of any corporate with multi-levels. Design a good graphic interface, where you can see monitor, cpu, keyboard, mouse, network chord, power points. The configurations of each system should be displayed on clicking those icons or through same button, including the date of purchase, installations, etc., If any user found any trouble with their system, they can enter the problem in brief. This report should be displayed to the maintenance group in red alert. Say, if an user have a mouse problem, he can click the mouse and record his problem, wherein for the maintenance view, the mouse will be in red colour. If the problem is cleaned it will be back to its original colour. This way a detailed project can be worked out, for shuffling the systems, accessories, extending work space area etc.,

Southern railway emu theory

December 7: 7:05, 7:25, 7:40, 8:05, 8:15. These are the train timings from chengalpattu to beach station in the morning. On that day, when i was in gate, rameswaram express by 7:20 crossed chengalpattu. I went to station, which was covered full of mist and there is no clear view to see the things, which is usual in the month of karthigai and margazhi. I witnessed no trains in the platform. Normally, 7:25 will leave from 5th platform and 7:40 from 4th platform. Thought 7:25 went in time after the express which is the routine. When a train came at 7:40, i realized from a co-fist class regular passenger that it was actually 7:25 train. After 5 mins, the train started. As expected, more crowds were witness in the stations and another passenger from vandalur informed that, the train was made local and the announcement was made by the vandalur station master. When the train reached tambaram, it happened. The train was made to run in tambaram-beach local line. Now the following are the ass...

What's in the names? About car names

hyundai-santro mahindra-bolero, scorpio, xylo tata-sumo, indigo maruthi-baleno, alto, eeco, estillo ford-figo mitsubishi-pajero -------- toyota-innova, corolla ford-fiesta hyundai-verna, elantra renault-scala maruthi-ertiga, versa tata-indica, victa, manza, aria nissan-micra Above are some samples of car names which ends with the sound "O" or "ah". Dos the r&d wings of this car companies involves in "how to name it?" also? Another revelation is none of this small-medium cars boast a big name in number of words like hindustan motors "ambassador". Think about this names also duster, fortuner, land cruiser....all ends with "r".